Close Menu
Nigeria Info
    What's Hot

    Trump has been called to stop delaying conflict in Ukraine Spite Putin

    August 3, 2025

    Wilfand warned about unusually hot weather in nine areas of the Russian Federation

    August 3, 2025

    In the UK, predictions about hawks about space invasion

    August 3, 2025
    Facebook X (Twitter) Instagram
    Nigeria Info
    • Home
    • Nigeria
    • Army
    • Economy
    • Society
    • Tech
    • World
    • Press
    Nigeria Info
    Home»Society»The Russian aircraft designer has reduced Kukurozkik production three times
    Society

    The Russian aircraft designer has reduced Kukurozkik production three times

    March 29, 20252 Mins Read
    Share
    Facebook Twitter Pinterest Reddit WhatsApp Email

    The aircraft designer from Krasnodar Sergey Borisenko has tripled the production of a Cournitic light aircraft by installing a helicopter engine on it. RIA Novosti has been informed about this in the Federal Air Force.

    The Russian aircraft designer has reduced Kukurozkik production three times

    The dialogue of the news agency noted that the Russian designer and colleague tried to improve An-2 for at least 10 years. In 2015, they presented Tr-301-Ngo aircraft without lower wings. In 2017, Borisenko introduced the Tr-301TB-AN-2 aircraft with the Czech M601 TurboProp M601 engine. Now the “corner” has passed a new revision.

    For the first time, we installed TV2-117 engines on An-2 aircraft from Mi-8 helicopter. It turned out that the Tr-301/117-Such aircraft like A-3, TVS-2MS, AN-2-100, but completely cheaper and cheaper than three times cheaper, the words of Bor Borisenko.

    The aircraft designer noted that the first flight of the new model will take place in one or two months. After that, Corn Corn was waiting for testing and receiving a flight fitness certificate.

    Earlier, it was reported that the Ural Civil Aviation Factory (Uzga) will receive an additional 10.4 billion rubles to replace the Soviet AN-2 replaced by Sovetsky's An-2, which needs to be replaced by a project of a light-purpose aircraft. The work development in the contract should be completed before December 17, 2027.

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Email
    Previous ArticleMSI has released an affordable game screen Mag 271QP X24 with OLED screen
    Next Article DPA: A protest of the roots must be held in Berlin

    Related Posts

    Wilfand warned about unusually hot weather in nine areas of the Russian Federation

    August 3, 2025

    Russian airport has introduced limitations on flights

    August 3, 2025

    Kadyrov lost a party for Bi -A for his son Adam and promised to take revenge on

    August 3, 2025

    Currrantov: Ivan Krasko is in a serious condition

    August 2, 2025

    The star of “national hunting” Ville Haapasalo is now looking like

    August 2, 2025

    The director of Taigan Zubkov once again came to Aviarry to the Lions because of the phone

    August 2, 2025
    Picks

    Trump has been called to stop delaying conflict in Ukraine Spite Putin

    August 3, 2025

    Wilfand warned about unusually hot weather in nine areas of the Russian Federation

    August 3, 2025

    In the UK, predictions about hawks about space invasion

    August 3, 2025

    Tesla Türkiye has launched a sales day: Will the sales of Tesla Model Y start?

    August 3, 2025

    Ministry of Defense: Defense force at night shot down 93 Ukrainian unmanned aircraft at night

    August 3, 2025

    Zelensky was strongly condemned after protest at Vinnitsa

    August 3, 2025

    Russian airport has introduced limitations on flights

    August 3, 2025

    Musk does not deny that people can become a hero simulating with anyone developing

    August 3, 2025
    • Home
    • Nigeria
    • Army
    • Economy
    • Society
    • Tech
    • World
    • Press release
    © 2025 NIGERIA INFO

    Type above and press Enter to search. Press Esc to cancel.